Skip to content
  • Home
  • Digital Art
  • Photography Gallery
  • About Me
  • Contact
  • Daily work progress blog
tobinrhall.com
Sign up
Sign up
  • Home
  • Digital Art
  • Photography Gallery
  • About Me
  • Contact
  • Daily work progress blog

Week 9 & 10 Conclusion to my WCC Internship

Leave a Comment / Uncategorized

This concludes my internship at WCC for desktop technical support. I have learned a lot during my time interning at WCC, both how to fix issues and how a successful IT department is run. While i have a good amount of knowledge on how to work on computers and find issues, it really is the […]

Week 9 & 10 Conclusion to my WCC Internship Read More »

12/3 Final day at WCC Internship

Leave a Comment / Uncategorized

Today I had my instructor at BTC come over to WCC and do a review on my internship with my supervisor at WCC. I also finished setting up a laptop for a faculty member. We have been troubleshooting a tablet that has been having a hard time getting connected to the network. The desktop support

12/3 Final day at WCC Internship Read More »

12/2 Fixing devices

Leave a Comment / Uncategorized

Today was spent mostly setting up new devices to be deployed around the campus. A new laptop came in that needed to be staged for a faculty member. Helping setup a new tablet that is used for students to check-in with. We had an issue with getting the tablet on the network yesterday, so we

12/2 Fixing devices Read More »

12/1 WCC Internship last week

Leave a Comment / Uncategorized

This is the last week of the internship, i decided to come an extra day this week as i only had one day the previous week due to Thanksgiving break. I was tasked with pairing a bunch of loose dongels to their correct peripheral. I was able to find a program that lets you know

12/1 WCC Internship last week Read More »

11/25 Thanksgiving week at WCC Internship

Leave a Comment / Uncategorized

The campus was pretty quite, as a lot of the students and faculty were already gone for Thanksgiving break. We worked on tracking down some devices around campus to update software, as they were not connected to the network and getting updates pushed to the device. I also replaced a few NVMe drives in a

11/25 Thanksgiving week at WCC Internship Read More »

Week 8 WCC Internship Update

Leave a Comment / Uncategorized

This week was spent mostly on doing tasks that were not very time sensitive, but important to stay on top of while there are no other pressing issues. I tested, fixed, rebuilt, and setup several devices that had been out of commission. I learned how an inventory system is setup and kept up to date

Week 8 WCC Internship Update Read More »

11/19/2025 Motherboard Day

Leave a Comment / Uncategorized

Today i replaced 4 motherboards into old systems that were already diagnosed not running. I was able to fix one of the old boards by changing the DIMM slot the RAM was seated in. Once the system was up i put a new copy of Windows on it and documented the MAC address and Computer

11/19/2025 Motherboard Day Read More »

11/18/2025 Back to the grindstone.

Leave a Comment / Uncategorized

Today was spent cloning and replacing a hard drive, checking a few stations around campus with minor issues. Internet connectivity to one station was fixed with a simple reset and reseating the cables. No major issues to deal with, so i worked on wiping and resetting a few backup computers.

11/18/2025 Back to the grindstone. Read More »

Week 7 Wcc Internship

Leave a Comment / Uncategorized

This week was mostly spent getting old devices cleaned up and ready to sell/donate. I also fixed a few devices that had errors during firmware update. After preparing the old devices they were cleaned up and moved out of storage. We didn’t have a lot of calls from staff/faculty for issues this week.

Week 7 Wcc Internship Read More »

11/5 Another Wednesday at WCC

Leave a Comment / Uncategorized

Today i continued to prep some iMac’s for sale/donation. I also fixed a couple thin clients that had errored during firmware update. I was able to do a factory reset on the thin client devices, then installed an operating system, and updated the clients to have the software needed to push updates. These are backup

11/5 Another Wednesday at WCC Read More »

Post pagination
1 2 3 Next →

Copyright © 2025 tobinrhall.com | Powered by tobinrhall.com